It's 6am in the morning as I'm blogging about our reno for the Toa Payoh flat. Yet again I've been bitten on the forehead and chin by a mozzie but this time hubs took only less than 5mins flat to smack her before she went on a blood sucking spree.

However now i'm suffering from an acid reflux and can't get back to sleep so I've decided to update you guys on our Toa Payoh Kitchen reno!

As you can see from the photos below, the carpentry works are almost completed now. The black granite has been installed. The electrician is here to do some of the wirings, hooking up the T5 lights for the kitchen top cabinets.
We have tried to conceal most of the powerpoints and switches. For the kitchen area, we have done up a partition board and all the wirings are going through this area so all our powerpoints are flushed with the backsplash.

see! even the powerpoint for the washer is concealed neatly into the cabinet instead of protruding out from a wall. You can't even see the trunking!!!

Above: here's a close up on the granite area where the 2 portions meet, there's a groove line over here. Not very visible from far. Even close up, I think the joint line is still acceptable.
 Dish rack and sink tap have been installed. Huge sink here.
Here's how the top cabinets look. It's actually in a shiny speckled finish but very very subtle. So when you take a closer look, there's a sheen to it.
The bottom cabinet is also finished in a shiny speckled laminate in grey.