Friday, January 02, 2015

Reno@CCK2 Maisonette - Laying the tiles

 Long break after christmas and today we are here for a quick look. The electrician is here to lay some electrical wirings and there are 4 men on the job to lay the marble tiles for the lower floor.


 Kitchen wall tiles are all up and so is the kitchen floor tiles
The balcony wall tiles are all done over the christmas break.

No comments:

Post a Comment

LinkWithin

Related Posts Plugin for WordPress, Blogger...